Under Construction - TAC Headquarters, Gheringhap St geelong

Ive put in a few shots of this building because its sheer scale makes it easy to discern the distribution of loads throughout the structure. (note: This site visit was conducted along with another student, Ryan Mitchell, so some of the images may be shared)

Above: Heavy reinforcement bars have been employed in this structure due to the ceiling heights on each floor.
Above: Precast panels pinned and cleated into place

Above: Scaffold rails are an essential part of the construction process until windows and walls have been affixed.